Concrete plant SKIP-120
183 441 $
Enquire conditions
and delivery time
We'll call you back within 15 minutes
Specify your requirements
Send prices and terms of delivery
- Twin-shaft concrete mixer BP-2G-3000S
- Планетарные мотор-редуктора "LIKEDRIVE" M310R, мощность привода 37 кВт - 2 шт
- gravitational separation of mixture components having different bulk mass
- The number of shafts 2, the number of spokes 2 x 8
- The blades are replaceable 16 pieces. Material: Cast iron CHH16N2T (highly doped chromium wear-resistant)
- Changeable armor flake type. Material: Cast iron ЧХ16Н2
- Automatic central lubrication system
- Secure access system
- Electricity to connect the remote control
- Maintenance kit (three armor, blade, needle)
- Concrete mixer machinery certificate
15 520 $
- Overpass Reinforced structure, adapted for unloading concrete at a height of 4,000 mm
- mixer platform with supporting structures
- Ladders for equipment maintenance
- Fence along the perimeter
- Staircase with handrails
- Funnel for unloading concrete with rubber guide
- Fastening construction for pipes and electric cables
- Hardware for the assembly trestle
- Coating: shotblasting, double coloration with drying chamber
- Total weight - 2500 kg
11 756 $
- Support frame (powder coated). Weight 450 kg
- Cement dispenser with 1,200 kg dosage (powder coated):
- Three inlet pipes for augers (Two are covered with lids)
- Connecting outer sheath with collar clamps
- Overpressure system
- Unloading disc pneumatic valve ∅300
- Strain gauges - 3 pcs.
- Signal amplifier - weight sensor
- Pneumatic distributors - 4 pcs.
- Vibrator MVE 300/3 - 1 pc.
- Dispenser 550 liters of water (powder coating):
- Strain gauges - 3 pcs.
- Unloading disc pneumatic valve ∅80
- Water dump pump
- Signal amplifier - weight sensor
- Dispenser chemical additive 80 liters stainless steel:
- Strain gauges - 2 pcs.
- Signal amplifier - weight sensor
49 919 $
- Bunkers of inert BI-80 (4 x 20) - 8 sections. The total volume is 80 cubic meters. meters
- Preparation under registers installation for heating inert materials
- Pneumatic equipment - 8 electric pneumatic distributors, a set of fittings and tubes, 8 quick exhaust valves, 1 pneumatic regulator, a filter with a pressure gauge
- Vibrator MVE 300/3 - 8 pcs.
- Dispenser inert CI-12 (conveyor) with the lined drive drum. Drive power 18,5 kW
- Rollers with anti-corrosion coating
- Strain gauges - 6 pcs.
- CAS connecting box
- Signal amplifier - weight sensor
- Passport to complex metering and purchased products
- Software on your own SCADA system complete with a monoblock: accounting for the consumption of materials and equipment operation, remote access and control over the work in the local network
- Automatic operation by pressing "one" button
- Recipe storage database for concrete production
- Programmable Logic Controller
- Сontrol panel case protection - IP54
- Power cabinet case protection - IP54
- Control, protective and switching equipment "Omron", "Siemens"
- Set of diagrams and instruction manual
- Hardware for assembly RBU: metering complex overpass screw silage
- Hardware, accessories
- Wire for screw fixing
- Kit for connecting the database (pnevmotruba, sleeves, bends, RVC 51-70 clamps, duct PVC-5-C-60)
- Limit switch for the database
- Kit vodopodvedeniya (pipe bends, sleeves, T-joints, anchor bolts, brackets)
- Kit RBU pneumatic (air tubing, pnevmotruba, fittings, hardware)
- Set of cables
- Couplings (5 titles)
- compactor
- Acid sealant TempPlus
- Power and control cables, protected by metal hose (in mobile plants they are laid in frame)
- Set of locking sensors and executing mechanisms position sensors (skip, mixer's gate, etc.)
- Twin-shaft concrete mixer MAO 3000
- Multi-channel uniform water spray system
- Replaceable wear-resistant Ni-Hard cast iron armor, strength 500 HB
- The hydraulic shutter drive system
- Kit for connecting pneumatic equipment (cleaning sealing units)
- Cement filter AIRFILL25 assembly (Turkey) in a rigid package
- Cartridges pneumatic cleaning system
- Adjusting ring
- Operational documentation
- Airfill v25 cement filter with a vibration cleaning (Türkiye)
- Adjusting ring
- Operational documentation
20 204 $
- Silo can (V=103m³): lid - 4 sectors, cylindrical section - 28 sectors, large cone - 4 sectors, small cone
- Mounting frame
- Stairs
- Cover protection enclosure - 11 sectors
- Loading pipe d 102 with connection lock
- Inspection hatch (Viewing window for inspection and cleaning of the cone)
- Connecting flanges for installation cement filter emergency valve, level sensors, aeration and vibrator
- Shot peening prior to application to the extent Sa 2 1/2 GOST P ISO 8501-1-2014
- Anti-corrosion protection is made with a two-component primer-enamel PentriProtect PUR 700 based on polyurethane-acrylic resin in the ATIS spray booth
- Frame for transportation
- Hardware for the assembly of a silo
- Polyurethane sealant Soudaflex FC 40 gray 600 ml - 15 tubes
- Machinery certificate
5 105 $
- Auger assembly
- Pipe Diameter 273 mm, tube length of 12 000 mm
- Drive: gear motor. Power 15 kW
- Inspection window for cleaning and maintenance
- Operational documentation
- Cement filter with vibration cleaning FCS-24 NEON assembled
- Filter elements - 14 pieces
- Stainless alloy steel body
- Vibrator - cartridge vibration cleaning system
- Silage setting ring
- Lid
- Machinery certificate
- Cement level sensor G2 1/2 220V assy in a package
- Adjusting ring
- Operational documentation
- Butterfly valve DN300
- Handle for gate control
- Operational documentation
CBP operation mode - fully automatic on the principle of "single button".
Twin-shaft concrete mixer BP-2G-3000s installed on an overpass at a height of unloading the finished mixture of 4 meters. The concrete mixer is equipped with a special bucket (skip) for lifting and loading the mixture components inside the concrete mixer.
Skip mixer has a bottom gate to reduce dust and increase discharge rate.
For storage and precise batching of the inert materials metering complex DCM-80. It is possible to supply bunkers of increased volume (up to 120 cubic meters). Inert materials are loaded and stored in bunkers, the number of bunkers is 4, 20 cubic meters each. meters, the total volume of bunkers is 80 cubic meters. meters. A dosing belt conveyor is installed under the bunkers, on which components are accurately dosed; the components are supplied from the bunkers by opening gate valves, the gates are controlled by a pneumatic system.
When the required dose of inerts has been collected, the conveyor is turned on and the dosed components are fed into the skip (bucket) of the concrete mixer. The skip rises and delivers the components into the mixing chamber of the concrete mixer.
Cement is stored in a special warehouse - a cement silo (not included in the basic package). Silos for cement must be selected based on a two-day performance margin. To supply cement from the silo to the cement dispenser, it is necessary to acquire the correct length screw.
Cement silos, silo piping and augers are always in stock in Zlatoust!
To feed cement from the silo into the cement dispenser there used cement auger, dispenser block BD-120, which consists of a 1200 kg cement dispenser, a 550 liter water dispenser and an 80 liter chemical additive dispenser.
Each dispenser is located on three high-precision load cells and a rigid frame, which increases dosing accuracy. The cement dispenser is equipped with a vibrator MVE 300/3 to encourage the removal of cement when it sticks.
All components of the mixture are mixed, after obtaining the necessary homogeneity of the mixture, the water seal of the concrete mixer is opened and the mixture is supplied to the concrete truck or receiving hopper. Then the cycle repeats.
One cycle lasts for 60 seconds maximum 2 cu. meters of ready-made concrete or mortar, the cycle lasts no more than 60 seconds. Installation capacity 90…120 cubic meters. meters of finished concrete or mortar per hour of work.
Checking the databases.
ZZBO is the official dealer of SICOMA concrete mixers in Russia and the CIS!
It is possible to supply a concrete plant with a concrete mixer from the manufacturer SICOMA.
- RBU capacity: up to 120 cubic meters. meters per hour
- Software on our own SCADA system complete with a monoblock: accounting of material consumption and equipment operation, remote access and control over the work
- Transportation in 2 euro trucks
- Reliable imported components
- 2 year full warranty
Technical Features
- Capacity, cu m per hour 90...120
- Automatic operating mode
- BP-2G-3000C concrete mixer
- Bunkers (number x volume m3) 4 x 20
- Cement silo, t (optional) 75...315
- Design summer
- Load of inert materials into the concrete mixer skip
- Total power, kW 139
- Sector valve, hydraulic
- Dimensions of the basic configuration:
- Weight, kg 28500
- Height, mm 10030
- Width, mm 3860
- Length, mm 23,000
Quality
certificates
Products
in stock
Individual configuration
with prices for each item
Mobile
commissioning
available
Worldwide
delivery
in trucks or containers
Geography of supplies 2011-2026
Own production, in-stock products and
professional team allow us guarantee
most competitive prices, shortest
possible delivery time and high-quality goods
Call UK hotline
Our managers will answer all your questions from Monday till Friday:
from 06:00 a.m. to 05:00 p.m. (GMT+3, Moscow time)
Address: Russia, Zlatoust, 57 Suvorov
e-mail: sales@zzbo.ru
Place your order
We will send you the price,
conditions and terms of delivery
Response within 1 hour
You will get the offer with
individual delivery and payment conditions

