Asphalt plant BMZ-80
357 838 $
Enquire conditions
and delivery time
We'll call you back within 15 minutes
Specify your requirements
Send prices and terms of delivery
47 231 $
- Twin-shaft asphalt mixer BMZ-80-01
- Twin-shaft asphalt mixer BMZ-80-01
- Twin-shaft asphalt mixer BMZ-80-01
- Twin-shaft asphalt mixer BMZ-80-01
- Pneumatic valves
- Connection set for pneumatic equipment
- Electricity to connect the remote control
- Operational documentation
23 678 $
- Bunker of hot inert materials - 5 sections. The total volume is 14 cubic meters. meters
- Mounting frame
- Sector valves, with control of pneumatic cylinders – 5 pcs.
- Pneumatic equipment – 5 pneumatic distributors, a set of fittings and tubes
- Connection set for pneumatic equipment
- The sensors of the upper and lower layer
- Temperature sensor in the hopper for fraction 0 ... 4 mm
- Electricity to connect the remote control
- Operational documentation
20 688 $
- Rumble - Dec 5 The total sieving area is 14 sq. meters
- Vibrators
- Screen replacement doors
- Spring support hatches
- Dust extraction
- Corrugated sieves made of spring steel
- Operational documentation
35 127 $
- Drive power 11 kW
- 70 buckets with a volume of 8 dm33 each
- Buckets with reinforced outer edges
- Increased serviceability chain
- loading box
- Spring tension
- Bearing units of increased strength
- Drive maintenance platform
- Dust extractor
- Discharge neck
50 940 $
- Cylindrical body with blades
- Base frame with driven rollers
- Box for receiving inert materials
- Flue gas removal
- Warming
- Electricity to connect the remote control
- Operational documentation
50 712 $
- Five batchers of inert materials DIK-8
- Five batchers of inert materials DIK-8
- Five batchers of inert materials DIK-8
- Electricity to connect the remote control
- Operational documentation
10 404 $
- Operator's cab (insulated)
- Support frame (trestle)
- Platform with stairs
- Стол и стул
- Operational documentation
- Air conditioning
45 809 $
- Software on your own SCADA system complete with a monoblock: accounting for the consumption of materials and equipment operation, remote access and control over the work in the local network
- Programmable Logic Controller
- Control panel/power cabinet in a dust and waterproof IP54 housing
- Control, protective and switching equipment "Siemens" (substitutes with similar characteristics are possible)
- Set of diagrams and instruction manual
11 186 $
- Frame base
- snail body
- 55 kW drive
- Guide vanes with shutters
- damper swing actuator
- Vybrooporы
- Electricity to connect the remote control
- Operational documentation
23 508 $
- Simplified operation due to the fact that the mixing unit can be removed without having to remove the burner from the boiler.
- Minimum and maximum flow adjustment for the first and second stages by means of an electric servomotor with a damper closing delay to prevent heat dissipation into the chimney.
- Equipped with one flange, one insulating jumper for fixing the boiler.
- Equipped with one flange, one insulating jumper for fixing the boiler.
14 472 $
- Cyclone block
- Bunker dust collectors
- OLI MVE-300/3 Vibrator - 1 piece
- Butterfly valve
- Connection set for pneumatic equipment
- Electricity to connect the remote control
- Operational documentation
15 777 $
- Drip eliminator on stand
- Chimney
- Service platform
- Water supply piping kit
- Pump "Calpeda NM 40 A / C" (Italy)
- Set of valves and pressure gauges
- Water tank for pump filling
- Venturi Duct Kit
- Electricity to connect the remote control
- Operational documentation
- Hardware for assembling asphalt concrete: a dosing complex, a drying drum, a bucket elevator, a mixing tower, an operator's cabin, a cyclone and a wet dust collector, a fan
- Hardware, accessories
- Kit for installing nodes on the foundation (anchor bolts, clamping strips)
- Kit for fixing augers, chimney (rope, lanyards, clamps)
- Kit for sealing the joints of nodes (tarpaulins, hoses, sleeves, clamps, heat-resistant and universal sealants)
- Set for the water supply system (pipes, bends, couplings, sleeves, clamps)
- Set for the ABZ pneumatic system (pneumatic tubes, fittings, hardware, distributors, PPRS pipes and fittings, limit switch blocks)
- Set of wires for connecting ABZ
- A set of power and control cables protected by a metal hose and laid in trays
- Set of sensors (blocking, position, level, temperature, pressure)
- Mixing tower support kit
- Set of equipment for installation of cable networks
- Duct kit
7 886 $
- Bunker with a volume of 8 cubic meters. meters
- Mounting frame
- Removable boards
- Conveyor feeder
- Oversized grille
- OLI MVE-300/3 Vibrator - 1 piece
- Electricity to connect the remote control
- Operational documentation
11 231 $
- Truss conveyor on racks
- Roller bearings
- Guide rollers
- Pressure rollers
- Telescopic poles with stops
- The tape is smooth
- Scraper on driven drum
- Electricity to connect the remote control
- Operational documentation
- Битумное хранилище БХ-45 - 3 шт
- Насос битумный 11кВт - 2 шт
- Комплект трубной обвязки коаксиального битумопровода с утеплением - 1 шт
- Колонка разливочная битумная Ду100 совмещённая с эстакадой расширительного бака - 1 шт
- Кабина оператора с пультовым оборудованием - 1 шт
- Котёл термомасляный КТМ-0,5 - 1 шт
- Ёмкость для аварийного сброса термального масла V=3м.куб. - 1 шт
- Расширительный бак атмосферного типа РБа-1 - 1 шт
- Станция закачки масла СЗМ-1 - 1 шт
- Комплект трубной обвязки термального масла с утеплением - 1 шт
- Битумная плавильня с боковой и верхней загрузкой БП-2 - 3 шт
8 482 $
- RMK-2M unpacker with lid
- OLI MVE-300/3 Vibrator - 1 piece
- Butterfly valve
- Dispenser of cellulose additive MZ-020
- [object Window]
- Connection set for pneumatic equipment
- Electricity to connect the remote control
- Operational documentation
24 439 $
- Cylindrical reservoir with a volume of 48 cubic meters m, from steel 09g2s with a thickness of 6 mm
- Warming from mineral wool 80 mm thick, sheathing from prof. sheet with a thickness of 0.5 mm
- Closed registers from a seamless pipe 57x4 ST 09G2C for heating bitumen coolant
- Service site with fences and stairs
- Luke-laz 600 mm and hatch for refueling the container with bitumen
- Deflector 250mm for ventilation of the container
- PT-100 type temperature sensor to control bitumen temperature
- Passport and Manual
7 463 $
- Silo Tank (V = 22m3)
- Mounting frame
- Stairs
- Cover protection enclosure
- Loading pipe d 102 with connection lock
- Connecting flanges for installation cement filter emergency valve, level sensors, aeration and vibrator
- Shot peening prior to application to the extent Sa 2 1/2 GOST P ISO 8501-1-2014
- Anti-corrosion protection is made with a two-component primer-enamel PentriProtect PUR 700 based on polyurethane-acrylic resin in the ATIS spray booth
- Machinery certificate
10 741 $
- Silo tank (V = 35m3)
- Mounting frame
- Stairs
- Cover protection enclosure
- Loading pipe d 102 with connection lock
- Connecting flanges for installation cement filter emergency valve, level sensors, aeration and vibrator
- Shot peening prior to application to the extent Sa 2 1/2 GOST P ISO 8501-1-2014
- Anti-corrosion protection is made with a two-component primer-enamel based on polyurethane-acrylic resin produced by PentriMAX in the ATIS spray booth
- Machinery certificate
- Cement filter with vibration cleaning FCS-24 NEON assembled
- Filter elements - 14 pieces
- Stainless alloy steel body
- Vibrator - cartridge vibration cleaning system
- Silage setting ring
- Lid
- Machinery certificate
58 339 $
- Top unit with filter bags and cleaning mechanisms
- Bottom unit of dust collecting bins with auger
- coasters
- Covers with manholes for maintenance
- Butterfly valves
- Connection set for pneumatic equipment
- Electricity to connect the remote control
- Operational documentation
- Thermal oil boiler KTM-0.3
- Automatic control cabinet
- Pump LQRY-65-50-180/2-С, 5.5 kW (coolant temperature up to +300 °С)
- Chimney Du-250, deflector-spark arrestor
- Weather canopy
- Horizontal tank, nominal volume: V=28 m3, wall thickness S=6mm
- Execution material: steel 09G2S
- Register system - 2 pcs. Made from ⌀57 mm seamless pipe
- Thermal insulation of the tank (URSA basalt S=50 mm, lining - corrugated sheet S=0.5 mm)
- thermometer showing
- Service platforms with stairs - 1 pc.
- ARIES DTS thermal converter
- Ventilation system: deflector 250 mm, service hatch 600 mm
- System of pipes, flanges and bends
- Passport for autonomous bitumen storage
11 655 $
- Bituminous plant assembled — 1 pc.
- Flanged full bore ball valve DN50 — 2 pcs.
- Flange 1-80-16 Steel 20 GOST 12820-80 (reciprocal) — 1 pc.
- Flange 1-50-16 Steel 20 GOST 12820-80 (reciprocal) - 2 pcs.
- Gasket A-50-16-PON GOST 15180-86 - 13 pcs.
- Gasket A-80-16-PON GOST 15180-86 — 1 pc.
- Термометр показывающий осевой БТ-51.211 (0-200)G-1/2".300.1,5 — 2 шт..
- Ladder — 1 pc.
- End fencing — 2 pcs.
- Large fence - 1 pc.
60 824 $
- Equipped with one flange, one insulating jumper for fixing the boiler.
- Bunker of marriage (substandard)
- Bunker of marriage (substandard)
- Skip
- Bunker of marriage (substandard)
- Pneumatic valves
- Connection set for pneumatic equipment
- Electricity to connect the remote control
- Operational documentation
- Five batchers of inert materials DIK-8
- Fuel/combustion air flow control by means of two servomotors controlled by an electronic unit.
- Adjustment of the minimum and maximum air flow through an electric stepper actuator with damper closing during a pause so that heat does not dissipate in the chimney.
- Diesel Injector Cooling Secondary Air Adjustment Device
14 307 $
- Цилиндрический резервуар, объемом 31 куб м, из стали 09Г2С с толщиной до 6 мм
- Warming from mineral wool 80 mm thick, sheathing from prof. sheet with a thickness of 0.5 mm
- Closed registers from a seamless pipe 57x4 ST 09G2C for heating bitumen coolant
- Service site with fences and stairs
- Luke-laz 600 mm and hatch for refueling the container with bitumen
- Дефлектор 250 мм для вентиляции емкости
- PT-100 type temperature sensor to control bitumen temperature
- Passport and Manual
- Термомасляный котёл с теплообменником в виде многоходовой спирали выполненной из горячекатаной трубы ДУ 50, сталь 09Г2С, с теплоизоляцией корпуса, обшитый нержавеющим листом с зеркальной поверхностью
-
Высокотемпературный насос для циркуляции теплоносителя в магистрали «котёл-потребитель».
Макс. темп. жидкости 300 °C. Мощность 7.5 кВт - Устройство плавного пуска (УПП) для запуска циркуляционного насоса
- Виброустойчивые манометры для визуального контроля давления на подающей и обратной магистрали котла
- Термосопротивление для управления режимами нагрева теплоносителя на подающей, обратной магистрали котла и на выходе дымовых газов
- Реле давления механическое для отключения насоса при превышении допустимого давления
- Реле давления дифференциальное для защиты циркуляционного насоса от «сухого хода»
- Напоромер для визуального контроля давления в топке
-
Пульт управления с регулятором «Термодат-11М6», с автоматическим нагревом масла по заданным уставкам температуры и выбором режим работы («Нагрев», «Стоп», «Циркуляция»), автоматическим отключением котла при превышении давления, авария горелки в оболочке IP54.
Регулировка температуры теплоносителя при помощи двухпозиционного или пропорционально-интегрально дифференциального (ПИД) закона регулирования для точной поддержки заданных параметров (Опция доступна при работе с модуляционной горелкой) - Запорная арматура: Клиновые задвижки типа 30С41НЖ
- Дегазатор для отведения газов и воздуха из теплоносителя
- Термостойкий дымоход Ду 250 с искрогасителем, высота 3,6 м
- Passport and Manual
57 960 $
- Two-block ready mix tank
- Skip distributor
- Two sections of the finished mixture, one section of the marriage (substandard)
- Pneumatic valves
- Connection set for pneumatic equipment
- Electricity to connect the remote control
- Operational documentation
15 146 $
- Bituminous foundry with a boiler on the frame — 1 pc.
- Block electric heater TENB-6Z, 6 kW — 20 pcs.
- Automatic control cabinet — 1 pc.
- Hot oil pump - 1 pc.
- Flange 1-80-16 Steel 20 GOST 12820-80 (reciprocal) — 1 pc.
- Gasket A-80-16-PON GOST 15180-86 — 1 pc.
- Axial indicating thermometer BT-51.211 — 1 pc.
22 251 $
- Термомасляный котёл с теплообменником в виде многоходовой спирали выполненной из горячекатаной трубы ДУ 50, сталь 09Г2С, с теплоизоляцией корпуса, обшитый нержавеющим листом с зеркальной поверхностью
-
Высокотемпературный насос LQRYN 80-50-180/2-C для циркуляции теплоносителя в магистрали «котёл-потребитель».
Макс. темп. жидкости 300 °C. Мощность 7.5 кВт - Устройство плавного пуска (УПП) для запуска циркуляционного насоса
- Виброустойчивые манометры для визуального контроля давления на подающей и обратной магистрали котла
- Термосопротивление для управления режимами нагрева теплоносителя на подающей, обратной магистрали котла и на выходе дымовых газов
- Реле давления механическое для отключения насоса при превышении допустимого давления
- Реле давления дифференциальное для защиты циркуляционного насоса от «сухого хода»
- Напоромер для визуального контроля давления в топке
-
Пульт управления с регулятором «Термодат-11М6», с автоматическим нагревом масла по заданным уставкам температуры и выбором режим работы («Нагрев», «Стоп», «Циркуляция»), автоматическим отключением котла при превышении давления, авария горелки в оболочке IP54.
Регулировка температуры теплоносителя при помощи двухпозиционного или пропорционально-интегрально дифференциального (ПИД) закона регулирования для точной поддержки заданных параметров (Опция доступна при работе с модуляционной горелкой) - Запорная арматура: Клиновые задвижки типа 30С41НЖ
- Дегазатор для отведения газов и воздуха из теплоносителя
- Термостойкий дымоход Ду 250 с искрогасителем, высота 3,7 м
- Passport and Manual
Asphalt plant model BMP-80, capacity of 80 tons of finished asphalt per hour.
Comes in different models, the selection of the necessary equipment assists the Sales Manager.
Job Description BMP-80
When loading dosing hoppers with inert materials (crushed stone and sand), they enter the drying drum in certain proportions, where they are dried and heated to 160 ° C by means of heating from the burner. The resulting dust and exhaust gases through the air duct system enter the filter unit, where the dust is separated and the exhaust gases are filtered. The separated dust is dosed and used to produce asphalt concrete.
After heating for elevator inert materials coming in bolt. The screen, in turn, separates materials into fractions and separates oversized inert materials, which are subsequently disposed of. The hot materials separated by fractions enter the storage bins of hot inert materials. Each of their fractions is weighed on a weight dispenser and in certain proportions (set based on the asphalt concrete formulation) enter the mixing drum.
In front of the mixing drum, mineral powder and bitumen dispensers are also installed. Mineral powder from the silo is fed into the batcher, weighed and sent to the dryer drum. In the same weigher, dust is weighed, which is filtered in the filter unit and used as it accumulates in the dust silo.
The bitumen is heated up to 150 °C in the bitumen storage, it enters the dispenser through the heated line, is weighed and pumped into the mixer. Initially, dry materials (crushed stone, sand, mineral powder) are mixed in the mixer, after bitumen is supplied, the final mixing takes place, which lasts no more than 20 seconds.
Ready asphalt comes from the mixing drum directly into the body of the truck.
- ZZBO production (Russia, Zlatoust). Warranty - 2 years
- Productivity - 80 tons per hour
- Service, spare parts and service from Russian manufacturer
- Automatic plant control SCADA-system, all data and control from one monitor
- All nodes in the transport envelope and delivery to the place of work of a typical transport
- A wide range of options: ext. silo, bitumen tanks, silos for powder and waste, all types of filters
Technical Features
- plant performance 80 t / h (3% moisture material)
- Supply hopper with inert materials, count and volume. 5 bins of 8 m3
- The thermal power of the burner 6500 kW
- Number screening sieves 5
- The volume of hot material hopper 14 м³
- Weight one batch 1,000 kg
- Total electric power of the plant, kW 230
- Drive power dryer drum 4 x 7.5 kW
- Area baghouse 430 м²
- power exhauster 55 kW
- tube height exhauster 15 meters
- Standard volume silo min. powder 35 м³
- Standard volume silage own dust 22 м³
- Performance bucket elevator 100 t / h
- Power bucket elevator 11 kW.
- mesh size sieve 4 мм, 8 мм, 12 мм, 16 мм, 40 мм.
- power vibration drive 2 x 3.2 kW
- Weighing hot inert materials 1,000 kg
- Power mixer drive 2 x 15 kW
- The dimensions of the cab 2.2 x 6 m
- The temperature of the final product 160 ℃
Quality
certificates
Products
in stock
Individual configuration
with prices for each item
Mobile
commissioning
available
Worldwide
delivery
in trucks or containers
Geography of supplies 2011-2026
Own production, in-stock products and
professional team allow us guarantee
most competitive prices, shortest
possible delivery time and high-quality goods
Call UK hotline
Our managers will answer all your questions from Monday till Friday:
from 06:00 a.m. to 05:00 p.m. (GMT+3, Moscow time)
Address: Russia, Zlatoust, 57 Suvorov
e-mail: sales@zzbo.ru
Place your order
We will send you the price,
conditions and terms of delivery
Response within 1 hour
You will get the offer with
individual delivery and payment conditions

