Prices are inclusive of customs clearance and VAT 0%
date: 16.01.2026
| Name | Price | Description |
|---|---|---|
| Concrete plant SKIP-25S | 49 980 $ | Volume 25 cubic meters m.hour, based on BP-1G-750 skip |
| SKIP-30 Concrete Plant | 64 687 $ | Capacity 30 cu m/hour, based on BP-2G-750 skip |
| SKIP-45 Concrete Plant | 87 507 $ | Capacity 45 cu m/hour, based on BP-2G-1200 skip |
| SKIP-60 Concrete Plant | 106 842 $ | Capacity 60 cu m/hour, based on BP-2G-1500 skip |
| SKIP-90 Concrete Plant | 126 394 $ | Volume 90 cubic meters mhour, based on BP-2G-2250 skip |
| Concrete plant SKIP-120 | 167 842 $ | Volume 120 cubic meters mhour, based on BP-2G-3000 skip |
| Name | Price | Description |
|---|---|---|
| LENTA-36 Concrete Plant | 66 483 $ | Capacity 36 cu m/hour, based on BP-2G-750 belt conveyor |
| LENTA-54 Concrete Plant | 95 127 $ | Capacity 54 cu m/hour, based on BP-2G-1200 belt conveyor |
| LENTA-72 Concrete Plant | 118 088 $ | Capacity 72 cu m/hour, based on BP-2G-1500 belt conveyor |
| Concrete factory Lenta-75s | 100 317 $ 105 600 $ | Ave. 75 cubic meters. m. hour, based on sicoma mso 1750 tape |
| LENTA-106 Concrete Plant | 122 339 $ | Capacity 106 cu m/hour, based on BP-2G-2250 belt conveyor |
| Concrete plant LENTA-120 | 152 412 $ | Pr-t 120 cu. m. time, based on BP-2G-3000 tape |
| Concrete plant LENTA-144M | 212 616 $ | Straight-five 144 cc. m. h, based on the PD-2G-3000 tape |
| Concrete factory tape-160 | 187 467 $ | Ave. 160 cubic meters. m. hour, based on sicoma mao 4500 |
| Concrete plant LENTA-216 | 230 752 $ 274 841 $ | [object Window] |
| Name | Price | Description |
|---|---|---|
| MOBIL-20 Concrete Plant | 39 225 $ | Capacity 20 cu m/hour, based on BP-1G-500 |
| MOBILE-25 concrete plant | 39 114 $ | Straight-five 25 cu. m. h, based on the BP-2T-375 |
| Concrete plant MOBIL-25P | 46 787 $ | [object Window] |
| Concrete plant MOBILE-45 | 59 741 $ | Straight-five 45 cu. m. h, based on the BP-2T-750 |
| MCP-20 concrete plant | 59 591 $ | Straight-five 20 cu. m. h, based on the BP-1G-500S |
| Concrete plant MCP-45 | 150 491 $ | Pr-t 45 cu. m. time, based on BPP-3B-1200 |
| Name | Price | Description |
|---|---|---|
| Concrete plant COMPACT 20 | 44 191 $ | Pr-T 20 cc. m time, the base BP-1G-skip 500 |
| Concrete plant KOMPAKT-25 | 44 933 $ | Pr-t 25 cubic meters. m hour, based on BP-2G-375 skip |
| Concrete plant KOMPAKT-25P | 59 603 $ | Pr-t 25 cubic meters. m hour, based on BPP-3V-375 skip |
| COMPACT-30 Concrete Plant | 70 956 $ | Capacity 30 cu m/hour, based on BP-2G-750 skip |
| COMPACT-45 Concrete Plant | 95 682 $ | Capacity 45 cu m/hour, based on BP-2G-1200 skip |
| COMPACT-60 Concrete Plant | 117 108 $ | Capacity 60 cu m/hour, based on BP-2G-1500 skip |
| COMPACT-90 Concrete Plant | 127 995 $ | Capacity 90 cu m/hour, based on BP-2G-2250 skip |
| Name | Price | Description |
|---|---|---|
| Concrete plant SMART-20 0.0-24 (2x12) | 46 840 $ | Capacity 20 cubic meters number of bunkers - 2 pcs. |
| Concrete plant SMART-20 0.0-36 (3x12) | 53 188 $ | Capacity 20 cubic meters number of bunkers - 3 pcs |
| Concrete plant SMART-20 0.0-48 (4x12) | 61 977 $ | Capacity 20 cubic meters number of bunkers - 4 pcs |
| Concrete plant SMART-20 2.0-24 (2x12) | 50 073 $ | Volume 20 cubic meters overpass height - 2m number of bunkers - 2 pcs |
| Concrete plant SMART-20 2.0-36 (3x12) | 56 422 $ | Volume 20 cubic meters overpass height - 2m number of bunkers - 3 pcs |
| Concrete plant SMART-20 2.0-48 (4x12) | 65 211 $ | Volume 20 cubic meters overpass height - 2m number of bunkers - 4 pcs |
| Concrete plant SMART-20 3.0-24 (2x12) | 50 670 $ | Volume 20 cubic meters overpass height - 3m number of bunkers - 2 pcs |
| Concrete plant SMART-20 3.0-36 (3x12) | 57 018 $ | Volume 20 cubic meters overpass height - 3m number of bunkers - 3 pcs |
| Concrete plant SMART-20 3.0-48 (4x12) | 65 807 $ | Volume 20 cubic meters overpass height - 3m number of bunkers - 4 pcs |
| Concrete plant SMART-30 2.0-24 (2x12) | 65 707 $ | Volume 30 cubic meters overpass height - 2 m number of bunkers - 2 pcs |
| Concrete plant SMART-30 2.0-36 (3x12) | 72 056 $ | Volume 30 cubic meters overpass height - 2 m number of bunkers - 3 pcs |
| Concrete plant SMART-30 2.0-48 (4x12) | 80 845 $ | Volume 30 cubic meters overpass height - 2m number of bunkers - 4 pcs |
| Concrete plant SMART-30 3.0-24 (2x12) | 65 834 $ | Volume 30 cubic meters overpass height - 3m number of bunkers - 2 pcs |
| Concrete plant SMART-30 3.0-36 (3x12) | 72 182 $ | Volume 30 cubic meters overpass height - 3m number of bunkers - 3 pcs |
| Concrete plant SMART-30 3.0-48 (4x12) | 80 971 $ | Volume 30 cubic meters overpass height - 3m number of bunkers - 4 pcs |
| Concrete plant SMART-30 4.0-24 (2x12) | 65 957 $ | Volume 30 cubic meters overpass height - 4 m number of bunkers - 2 pcs |
| Concrete plant SMART-30 4.0-36 (3x12) | 72 306 $ | Volume 30 cubic meters overpass height - 4 m number of bunkers - 3 pcs |
| Concrete plant SMART-30 4.0-48 (4x12) | 81 094 $ | Volume 30 cubic meters overpass height - 4 m number of bunkers - 4 pcs |
| Name | Price | Description |
|---|---|---|
| Concrete plant QUICK BETON TWIN-35 | 70 572 $ | [object Window] |
| Concrete plant QUICK BETON PLAN-35 | 76 368 $ | Volume 35 cubic meters m.hour, based on BPP-3V-750 tape |
|
Concrete plant QUICK BETON TWIN AUTO-35 on chassis |
102 292 $ 110 318 $ | Volume 35 cubic meters m.hour, based on BP-2G-750 tape, chassis |
| Concrete plant QUICK BETON-55 | 103 455 $ | Straight-five 55 cu. m. h, based on the PD-2G-1200 tape |
| Concrete plant QUICK BETON-75 | 118 409 $ | Straight-five 75 cu. m. h, based on the PD-2G-1500 tape |
| QUICK BETON-95 concrete plant | 122 327 $ | Straight-five 95 cu. m. h, based on the PD-2G-2250 tape |
| Name | Price | Description |
|---|---|---|
| Concrete plant LEADER-20 | 141 554 $ | Straight-five 20 cu. m. h Winterization |
| Concrete plant FLAGMAN-25 | 68 869 $ | Project 25 cubic meters. m.hour, winter version |
| Concrete factory flagship-30s | 102 142 $ | Ave. 30 cubic meters. m. Hour, winter performance / DKT-24S |
| FLAGMAN-30 Concrete Plant | 107 918 $ | Capacity 30 cu m/hour, winterized |
| FLAGMAN-45 Concrete Plant | 148 729 $ | Capacity 45 cu m/hour, winterized |
| Concrete factory flagship-60s | 160 734 $ | Ave. 60 cubic meters. m. hour, winter performance volume of bunkers 40 m³ |
| FLAGMAN-60 Concrete Plant | 170 155 $ | Capacity 60 cu m/hour, winterized |
| Flagship-75LS concrete plant | 180 237 $ | Ave. 75 cubic meters. m. hour, winter performance based on sicoma, tape supply of inert |
| FLAGMAN-90 Concrete Plant | 185 871 $ | Capacity 90 cu m/hour, winterized |
| Concrete factory flagship-106l | 206 674 $ | Ave. 106 cubic meters. m. hour, winter performance tape supply of inert |
| Concrete factory flagship-120l | 244 195 $ | Ave. 120 cubic meters. m. hour, winter performance tape supply of inert |
| Concrete plant FLAGMAN-144M | 343 636 $ | Volume 144 cubic meters m.hour, winter version |
| Concrete plant FLAGMAN-216 | 409 018 $ | Volume 216 cubic meters. m.hour, winter version |
| Name | Price | Description |
|---|---|---|
| Mixer-100 concrete plant | 77 574 $ | Ave. 100 cubic meters. m. for the production of a mixture of concrete, and unloading it directly to the car concrete mixer. |
| Name | Price | Description |
|---|---|---|
| Mobile asphalt plant MAZ-20 | 133 681 $ | Productivity 20 tons hour |
| Asphalt plant BMZ-80 | 357 838 $ | Productivity 80 tons hour |
| Asphalt concrete plant BMZ-160 | 818 532 $ 885 868 $ | Capacity 160 tons/hour |
| Screen MZ-004 | 20 688 $ | Drive power, 7.5 kW |
| Accumulative bunker МЗ-005 | 23 678 $ | Hopper volume, 14 m3 |
| Mixing unit MZ-017 | 47 231 $ | Mixing weight of the asphalt mixer 1000 kg |
| Asphalt mixer BMZ-80 | 27 748 $ | Productivity up to 80 tons / hour |
| Belt conveyor LK 18-0.6 | 11 231 $ | Drive power, 7.5 kW |
| Drying drum МЗ-002 | 50 940 $ | End product capacity, 80 t / h |
| Inert conveyor batcher DIK-8 | 7 886 $ | Hopper working volume, 8 m3 |
| Operator cabin for asphalt plant | 10 404 $ | ABZ management |
| Teplo BX-30 bitumen | 14 307 $ | For bitumen at ABZ. Capacity 31 cubic meters |
| Teplo BX-45 bitumen | 24 439 $ | Under the bitumen at the ABZ. Capacity 45 cubic meters |
| Bucket elevator MZ-003 | 35 127 $ | For lifting hot aggregates. Prospect, 100 t / h |
| Wet dust collector MZMP-40 | 15 777 $ | For humidification of dust particles and flue gases, |
| Cyclone dust collector MZTsP-40 | 14 472 $ | Coarse filter. |
| Ready mixture accumulator МЗНР-50 | 57 960 $ | For distribution and unloading from under the mixer of the finished asphalt mix or substandard |
|
Filtering installation hose MZ-010 |
58 339 $ | For cleaning from dust and flue gases |
| Cellulose additive unit MZA-1500 | 8 482 $ | For dosing cellulose additives into an asphalt mixer |
| SCP-32 cement silo | 7 463 $ | Under the dust at the ABZ. Capacity 32 tons. |
| SCP-52 cement silo | 10 741 $ | Under min. powder at the ABZ. Capacity 52 tons |
| Name | Price | Description |
|---|---|---|
| Concrete plant Mini RBU-10 | 16 285 $ | Capacity 10 cu m/hour, based on BP-1G-450 skip |
| Concrete plant Mini RBU-15 | 18 821 $ | Capacity 15 cu m/hour, based on BP-2G-375 skip |
| Concrete plant Mini RBU-30 | 29 236 $ | Capacity 30 cu m/hour, based on BP-2G-750 skip |
| Name | Price | Description |
|---|---|---|
| BP-1G-100 Concrete Mixer | 1 890 $ | Loading volume - 100l, finished concrete batch volume - 70l |
| BP-1G-300 Concrete Mixer | 3 698 $ | Loading volume - 300l, finished concrete batch volume - 200l |
| BP-1G-500 single-shaft concrete mixer | 10 213 $ | Loading volume - 500l, finished concrete batch volume - 333l |
| Single-shaft mixer BP-1G-500S | 12 219 $ | Loading volume - 500l, finished concrete batch volume - 333l |
| Single-shaft mixer BP-1G-500c | 12 110 $ | Loading volume - 500l, finished concrete batch volume - 333l |
| Single-shaft concrete mixer BP-1G-750 | 17 176 $ | Loading volume - 750l, finished concrete batch volume - 500l |
| Single-shaft concrete mixer BP-1G-750S | 17 261 $ 21 818 $ | Loading volume - 900l, finished concrete batch volume - 600l |
| Single-shaft concrete mixer BP-1G-1500 | 39 327 $ | Loading volume - 1500l, ready mix volume for concrete - 1000l |
| Single-shaft concrete mixer BP-1G-1500s | 47 676 $ | Loading volume - 1500l, ready mix volume for concrete - 1000l |
| Name | Price | Description |
|---|---|---|
| BP-2G-375 Twin-Shaft Concrete Mixer | 10 102 $ | Loading volume - 375l, ready mix volume for concrete - 250l |
| BP-2G-375s Twin-shaft concrete mixer | 12 852 $ | Loading volume - 375l, ready mix volume for concrete - 250l |
| BP-2G-750 Twin-shaft concrete mixer | 17 176 $ | Loading volume - 750, finished concrete batch volume - 500 l |
| BP-2G-750s Twin-shaft concrete mixer | 21 818 $ | Loading volume - 750, finished concrete batch volume - 500 l |
|
Twin-shaft concrete mixer SICOMA MSO 750 |
28 093 $ | Loading volume - 750, finished concrete batch volume - 500 l |
| BP-2G-1200 Twin-shaft concrete mixer | 24 373 $ | Loading volume - 1200l, finished concrete batch volume - 800l |
| BP-2G-1200s Twin-shaft concrete mixer | 28 882 $ | Loading volume - 1200l, finished concrete batch volume - 800l |
| BP-2G-1500 Twin-shaft concrete mixer | 39 327 $ | Loading volume - 1500l, ready mix volume for concrete - 1000l |
| BP-2G-1500s Twin-shaft concrete mixer | 47 676 $ | Loading volume - 1500l, ready mix volume for concrete - 1000l |
|
Twin-shaft concrete mixer SICOMA MSO 1750 |
35 339 $ | Loading volume - 1750l, finished concrete batch volume - 1250l |
|
Twin-shaft concrete mixer SICOMA MAO 2250 |
40 222 $ | Loading volume - 2250l, ready mix volume for concrete - 1500l |
| BP-2G-2250 Twin-shaft concrete mixer | 42 389 $ | Loading volume - 2250l, ready mix volume for concrete - 1500l |
| BP-2G-2250s Twin-shaft concrete mixer | 56 493 $ | Loading volume - 2250l, ready mix volume for concrete - 1500l |
|
Twin-shaft concrete mixer SICOMA MAO 3000 |
45 289 $ | Loading volume - 3000l, ready mix volume for concrete - 2000l |
| Twin-shaft concrete mixer BP-2G-3000 | 61 278 $ | Loading volume - 3000l, ready mix volume for concrete - 2000l |
|
Twin-shaft concrete mixer SICOMA MAO 4500 |
53 113 $ | Loading volume - 4500l, finished concrete batch volume - 3000l |
| Name | Price | Description |
|---|---|---|
|
Planetary concrete mixer SICOMA MPC 375 |
17 775 $ | Loading volume - 375l, ready mix volume for concrete - 250l |
|
Planetary concrete mixer SICOMA MPC 750 |
22 973 $ | Loading volume - 750l, finished concrete batch volume - 500l |
|
Planetary concrete mixer SICOMA MPC 1125 |
28 880 $ | Loading volume - 1125l, finished concrete batch volume - 750l |
|
Planetary concrete mixer SICOMA MPC 1500 |
37 020 $ | Loading volume - 1500l, ready mix volume for concrete - 1000l |
|
Planetary concrete mixer SICOMA MPC 2250 |
51 459 $ | Loading volume - 2250l, ready mix volume for concrete - 1500l |
| Name | Price | Description |
|---|---|---|
|
Continuous mixer actions CIS-300 |
40 840 $ | Capacity up to 300 t/h |
| Name | Price | Description |
|---|---|---|
| Dosing complex DKP-10 | 11 055 $ | Bunkers 2 pieces of 5 cubic meters. m. Installation without foundation |
| Dosing complex DKS-16 | 15 887 $ | Bunkers 2 pieces of 8 cubic meters. m. Installation without foundation |
| DKS-24 Dosing complex | 20 914 $ | Bunkers 3 pieces of 8 cubic meters. m. Installation without foundation |
| Dosing complex DKS-32 | 27 518 $ | Bunkers 4 pieces of 8 cubic meters. m. Installation without foundation |
| Dosing complex DKT-24S | 21 672 $ | Bunkers 2 pieces of 12 cubic meters each. m. Installation without foundation |
| Dosing complex DKT-36S | 28 021 $ | Bunkers 3 pieces of 12 cubic meters. m. Installation without foundation |
| Dosing complex DKT-48S | 36 809 $ | Bunkers 4 pieces of 12 cubic meters. m. Installation without foundation |
| Dosing complex DCM-40 | 27 765 $ | Bunkers 2 pieces of 20 cubic meters. m. Installation without foundation |
| Dosing complex DCM-60 | 35 159 $ | Bunkers 3 pieces of 20 cubic meters. m. Installation without foundation |
| Dosing complex DCM-80 | 45 683 $ | Bunkers 4 pieces of 20 cubic meters. m, DI-12, installation without foundation |
| Dosing complex DKM-120 | 67 198 $ | Bunkers 4 pieces of 30 cubic meters. m. Installation without foundation |
| The metering range of the DC-24 (mobile) | 28 383 $ | Bunkers 2x12 m3, installation without pit and foundation |
| The metering range of the DC-36 (mobile) | 34 938 $ | Bunkers 3x12 m3, installation without pit and foundation |
| The metering range of the DC-54 (mobile) | 37 110 $ | Bunkers 3x18 m3, installation without pit and foundation |
| 17 654 | 50 712 $ | Bunkers 5x8 m3, Own conveyor-feeder on each bunker |
| Name | Price | Description |
|---|---|---|
| BD-7 block of dispensers | 5 206 $ | For: cement 75 kg, water 30 l, chemicals 5 l |
| BD-15 Block of Dispensers | 5 900 $ | For: cement 150 kg, water 75 l, chemicals 10 l |
| BD-30 Block of Dispensers | 6 825 $ | For: cement 300 kg, water 150 l, chemicals 20 l |
| BD-45 Block of Dispensers | 8 073 $ | For: cement 500 kg, water 250 l, chemicals 30 l |
| BD-60 block of dispensers | 8 190 $ | For: cement 600 kg, water 300 l, chemicals 40 l |
| BD-90 block of dispensers | 9 045 $ | For: cement 900 kg, water 450 l, chemicals 60 l |
| Block dozatorov DB-120 | 10 758 $ | Cement: 1200 kg Water 550 l, 80 l chemistry.. |
| DVPL-1 water dispenser | 1 125 $ | Flowing type, 1" diameter, with PA |
| DVPL-2 Water Dispenser | 1 841 $ | Through type 2" diameter, with PA |
| DCH-90 Dry chemical additives dispenser | 2 029 $ | Capacity 1.2 cubic meters hour, power 0,75 kW |
| Scales automobile WAC-18 (12 6) | 29 823 $ | Weight 50 tons, the length of the platform 18m |
| Fiber dispenser | 2 234 $ | The highest dosing limit for fibers with a bulk density of 123 kg/m³ |
| Name | Price | Description |
|---|---|---|
| Horizontal tank steel RGS-10 | 4 288 $ | The container for storing liquid, non -combustible, non -toxic products. RGS case V = 10 |
| Horizontal steel tank RGS-15 | 5 146 $ | The container for storing liquid, non -combustible, non -toxic products. RGS case V = 15 |
| Horizontal Tank Steel RGS-20 | 6 431 $ | The container for storing liquid, non -combustible, non -toxic products. RGS case V = 20 |
| Horizontal steel tank RGS-25 | 7 294 $ | The container for storing liquid, non -combustible, non -toxic products. RGS case V = 25 |
| Horizontal tank steel RGS-35 | 8 154 $ | The container for storing liquid, non -combustible, non -toxic products. RGS case V = 35 |
| Horizontal Steel RGS-40 | 9 439 $ | The container for storing liquid, non -combustible, non -toxic products. RGS case V = 40 |
| Horizontal steel tank RGS-45 | 10 299 $ | The container for storing liquid, non -combustible, non -toxic products. RGS case V = 45 |
| Name | Price | Description |
|---|---|---|
| PRU manual control panel | 3 464 $ | Hand control, economical option |
|
Control panel dosing complex for PrEP/VCT/DKS |
1 521 $ | Automatic control panel for dosing complex |
| PLA semi-automatic control panel | 6 906 $ | Semi-automatic, economy version |
| PAM 4.0 SCADA control panel | 6 166 $ | Full automatic expense accounting, reports, remote control |
|
PA-3.0 SCADA-5.0 control panel with monoblock |
9 310 $ | Full automatic machine. Consumption accounting, reports, remote control |
| Video surveillance system | 1 667 $ | For 24/7, continuous monitoring |
| Name | Price | Description |
|---|---|---|
| Rastarivatelʹ big-beg cement RMK-2M | 985 $ | Cement big-bags discharge |
| RMK-2MP cement big bag grinder is designed for grinding cement big bag bags | 1 486 $ | 17 654 |
| RMK-2MR cement big bag grinder | 1 084 $ | Cement big-bags discharge |
| Rastarivatel URM in the base (b) | 2 084 $ | Cement big-bags discharge |
| Cement big bag dispenser RC-6 | 2 454 $ | Unpacking big bags of cement. Increased loading volume – capacity 6 tons |
| Unloader with self-loading URM | 3 838 $ | Unwinder with add-on for electric/manual hoist. The hoist is supplied separately. |
| STs-12 Cement Silo | 247 262 $ | Capacity 12 tons, all-welded D 2.3 m |
| STs-22 Cement Silo | 5 233 $ | Capacity 22 tons, all-welded D 2.3 m |
|
Cement silo cell Pocket SMK-22 |
Concrete plant MOBIL-25P $ | Capacity 22 tons, all-welded all-welded D 3.5 mm 2.4 m |
| STs-32 Cement Silo | 6 221 $ | Capacity 32 tons, all-welded all-welded D 3.5 mm 2.3 m |
| Mobile cement silo JTF-35 | 15 566 $ | Mobile, capacity 35 tons |
| STsR-35 Cement Silo | 8 220 $ | Demountable, capacity of 35 tons, D 3,5 m |
| STs-42 Cement Silo | 7 174 $ | Capacity 42 tons, all-welded all-welded D 3.5 mm2.3 m |
| STsR-50 Cement Silo | 9 920 $ | Demountable, capacity of 50 tons, D 3,5 m |
| STs-52 Cement Silo | 8 331 $ | Capacity 52 tons, all-welded all-welded D 3.5 mm 2.3 m |
| Cement silo MCT-56 | 9 441 $ | Telescopic, capacity 56 tonnes, D 2,3 m |
| STs-62 Cement Silo | 9 509 $ | Capacity 62 tons, all-welded all-welded D 3.5 mm 2.3 m |
| STs-72 Cement Silo | 11 347 $ | Capacity 72 tons, all-welded all-welded D 3.5 mm 2.3 m |
| Cement silo SCU-74 | 12 335 $ | Capacity 74 tons, all-welded D 3.5 mm |
| STsR-75 Cement Silo | 11 542 $ | Demountable, capacity of 75 tons, D 3,5 m |
| Cement silo SCU-95 | 13 088 $ | Capacity 95 tons, all-welded D 3.5 mm |
| Cement silo SCT-95 | 16 945 $ | Telescopic, capacity 95 tons, D 2.3 m |
| Cement silo SCU-115 | 14 462 $ | Capacity 115 tons, all-welded D 3.5 mm |
| STsR-100 Cement Silo | 13 084 $ | Demountable, a capacity of 100 tons, D 3,5 m |
| STsR-120 Cement Silo | 14 655 $ | Demountable, the capacity of 120 tons, D 3,5 m |
| Cement silo SCU-135 | 16 176 $ | Capacity 135 tons, all-welded D 3.5 mm |
| STsR-140 Cement Silo | 16 310 $ | Demountable, the capacity of 140 tons, D 3,5 m |
| Cement silo SCU-155 | 17 104 $ | Capacity 155 tons, all-welded D 3.5 mm |
| STsR-160 Cement Silo | 18 680 $ | Demountable, the capacity of 160 tons, D 3,5 m |
| STsR-180 Cement Silo | 22 302 $ | Demountable, the capacity of 180 tons, D 5 m |
| STsR-215 Cement Silo | 23 977 $ | Demountable, the capacity of 215 tons, D 5 m |
| STsR-250 Cement Silo | 27 254 $ | Demountable, the capacity of 250 tons, D 5 m |
| STsR-290 Cement Silo | 31 516 $ | Demountable, the capacity of 290 tons, D 5 m |
| STsR-315 Cement Silo | 33 934 $ | Demountable, the capacity of 315 tons, D 5 m |
| Cement silo SPS-345 | 42 134 $ | Demountable, the capacity of 345 tons, D 6 m |
| Cement silo SPSTS-345 | 57 817 $ | Demountable, the capacity of 345 tons, D 6 m |
| Cement silo SPSV-345 | 78 282 $ | Under a wagon, collapsible, capacity 345 tons, D 6 m |
| cement silo ATP-410 | 45 585 $ | Demountable, the capacity of 410 tons, D 6 m |
| cement silo SPSTS-410 | 61 407 $ | Demountable, the capacity of 410 tons, D 6 m |
| Cement silo SPSV-410 | 81 112 $ | Under a wagon, collapsible, capacity 410 tons, D 6 m |
| Cement silo SPS-465 | 52 303 $ | Demountable, the capacity of 465 tons, D 6 m |
| Cement silo SPSTS-465 | 64 768 $ | Demountable, the capacity of 465 tons, D 6 m |
| Cement silo SPSV-465 | 85 588 $ | Under a wagon, collapsible, capacity 465 tons, D 6 m |
| Cement silo SPS-520 | 56 317 $ | Demountable, the capacity of 520 tons, D 6 m |
| Cement silo SPSTS-520 | 68 595 $ | Demountable, the capacity of 520 tons, D 6 m |
| Cement silo SPSV-520 | 89 344 $ | Under a wagon, collapsible, capacity 520 tons, D 6 m |
| Cement silo SPU-650 | 81 787 $ | Demountable, the capacity of 650 tons, D 7,6 m |
| Cement silo SPUV-650 | 112 715 $ | Under a wagon, collapsible, capacity 650 tons, D 7.6 m |
| Cement silo SPU-920 | 93 791 $ | Demountable, the capacity of 920 tons, D 7,6 m |
| Cement silo SPUV-920 | 122 095 $ | Under a wagon, collapsible, capacity 920 tons, D 7.6 m |
| Cement silo SPV-1160 | 157 570 $ | Dismountable, increased capacity, 1160 tons, D 10 m |
| Cement silo SPV-1340 | 164 711 $ | Dismountable, increased capacity, 1340 tons, D 10 m |
| Cement silo SPV-1520 | 171 530 $ | Dismountable, increased capacity, 1520 tons, D 10 m |
| Cement silo SPV-1700 | 178 372 $ | Dismountable, increased capacity, 1700 tons, D 10 m |
| Cement silo SPV-1880 | 186 663 $ | Dismountable, increased capacity, 1880 tons, D 10 m |
| Cement silo SPV-2060 | 194 332 $ | Dismountable, increased capacity, 2060 tons, D 10 m |
| Cylindrical sector for CMS silage | 2 411 $ | To increase silage CMS |
| Name | Price | Description |
|---|---|---|
| Cement filter with pneumatic cleaning AIRFILL DUSTPRO18 | 1 284 $ | Area 1600 m³/hour, filtering surface 18.8 sq.m |
| Cement filter with pneumatic cleaning AIRFILL25 | 1 442 $ | Area 2136 m³hour, filtering surface 25.1 sq.m |
| Cement filter with vibration cleaning AIRFILL V25 | 1 618 $ | Area 2136 m³hour, filtering surface 25.1 sq.m |
|
Stainless Steel Cement Filter FCS-14NEON with mounting ring |
1 007 $ | Area 1400 m³/hour, filter surface 14 sq.m, vibration cleaning |
|
Stainless Steel Cement Filter FCS-24NEON with set ring |
1 157 $ | Capacity 2200 m³/hour, filter surface 24 sq.m, vibration cleaning |
| Butterfly valve DN300 with manual drive | 188 $ | Completed with lever, diameter 300 mm |
| Silos breaker | 214 $ | To reduce the pressure of the material column inside the silo cone |
| Cement level sensor G2 1/2 220V | 114 $ | Indicates the level of cement in silo |
| Aeration system silo SC | 343 $ | For motivation air cement |
| silo aeration system CMS | 388 $ | For motivation air cement |
| Silo aeration system STSG | 425 $ | For motivation air cement |
| silo aeration system JV | 570 $ | For motivation air cement |
| ATP silo aeration system | 618 $ | For motivation air cement |
| silo aeration system SPU | 621 $ | For motivation air cement |
| Silo aeration system SPV | 645 $ | For motivation air cement |
| Emergency pressure relief valve PV273 | 215 $ | To maintain the operating pressure within the cement silo |
| Vibrator MVE 300/3 | 140 $ | For cement free falling |
| CPP-600 pneumochamber pump | 5 756 $ | For the pumping of cement, precious stones and diamonds 40 tons hour |
| Replacement Cartridge Set for cement filter AIRFILL-25 | 323 $ | Set of 4 pieces |
|
Stainless steel valve XD-YF250A NEON with set ring |
149 $ | To prevent the formation of excessive air pressure |
| Loader telescopic LB with filter | 7 728 $ | For loading cement from a silo into cement trucks |
| Cement filter connection kit with pneumatic cleaning | 64 $ | To ensure the operation of the pneumatic cleaning system of cement filter cartridges |
| Name | Price | Description |
|---|---|---|
| Screw dlya cement ⌀114 3000 | 1 621 $ | Diameter 114 mm, length 3 m |
| Auger for cement ⌀1146000 | 2 118 $ | Diameter 114 mm, length 6 m |
| Screw conveyor ⌀168/4,000 | 2 180 $ | Diameter 168 mm, length 4 m |
| Screw conveyor ⌀168/6,000 | 2 524 $ | Diameter 168 mm, length 6 m |
| Auger for cement ⌀168 7500 | 3 061 $ | Diameter 168 mm, length 7.5 m |
| Screw conveyor ⌀168/9,000 | 3 212 $ | Diameter 168 mm, length 9 m |
| Screw conveyor ⌀168/10,000 | 3 409 $ | Diameter 168 mm, length 10 m |
| Screw conveyor ⌀168/12,000 | 3 929 $ | Diameter 168 mm, length 12 m |
| Auger for cement ⌀2194000 | 2 409 $ | Diameter 219 mm, length 4 m |
| Auger for cement ⌀2196000 | 2 979 $ | Diameter 219 mm, length 6 m |
| Auger for cement ⌀2197000 | 3 350 $ | Diameter 219 mm, length 7 m |
| Auger for cement ⌀2197500 | 3 411 $ | Diameter 219 mm, length 7.5 m |
| Auger for cement ⌀2199000 | 3 595 $ | Diameter 219 mm, length 9 m |
| Auger for cement ⌀21910000 | 4 033 $ | Diameter 219 mm, length 10 m |
| Screw dlya cement ⌀219 11500 | 4 499 $ | Diameter 219 mm, length of 11.5 m |
| Auger for cement ⌀21912000 | 4 554 $ | Diameter 219 mm, length 12 m |
| Auger for cement ⌀21913000 | 5 027 $ | Diameter 219 mm, length 13 m |
| Auger for cement ⌀21915000 | 5 507 $ | Diameter 219 mm, length 15 m |
| Screw conveyor ⌀273/6,000 | 3 327 $ | Diameter 273 mm, length 6 m |
| Screw conveyor ⌀273/9,000 | 4 137 $ | Diameter 273 mm, length 9 m |
| Screw conveyor ⌀273/10,000 | 4 509 $ | Diameter 273 mm, length 10 m |
| Screw conveyor ⌀273/12,000 | 5 105 $ | Diameter 273 mm, length 12 m |
| Auger for cement ⌀27313000 | 5 417 $ | Diameter 273 mm, length 13 m |
| Auger for cement ⌀27315000 | 6 438 $ | Diameter 273 mm, length 15 m |
| Auger for cement ⌀32310000 | 6 666 $ | Diameter 323 mm, length 10 m |
| Auger for cement ⌀32312000 | 7 384 $ | Diameter 323 mm, length 12 m |
| Name | Price | Description |
|---|---|---|
| Vibropress Ultra Mini | 8 651 $ | Mini vibropress without hopper for small concrete products |
| Vibropress Ultra Mini with bunker | 9 734 $ | Compact vibropress with hopper for small concrete products |
| Vibropress ULTRA Mini with module | 13 990 $ | Compact vibropress module feeding a concrete mixture into the matrix to small concrete products |
| Vibropress ULTRA Mini with conveyor | 15 824 $ | Compact concrete block press with conveyor for small-piece concrete products |
| Vibropress uLTRA | 17 492 $ | Compact vibropress with hopper, feeding trays and a mixture supply module |
| Vibropress Ultra 2.0 | 19 324 $ | Compact vibropress with hopper for small concrete products |
| Vibropress ULTRA PRO 2.0 | 21 296 $ | Compact vibropress with hopper for small concrete products |
| Vibropress Ultra 3.0 | 22 996 $ | Compact vibropress module feeding a concrete mixture into the matrix module automatic feeding pallets hydraulic lift, the second module layer |
| Vibropress ULTRA 3.0+ | 30 447 $ | Compact vibrating press with a module for feeding concrete mixture into a matrix, a module for automatic feeding of pallets, a hydraulic lift, a module for the second layer, an automatic control panel. There is no manual labor. |
| Name | Price | Description |
|---|---|---|
| STANDARD Block Making Machine | 30 976 $ | Regular vibropress with molding zone 400h1000 |
| Vibropress STANDART 2.0 | 33 613 $ | Universal vibropress III dimensional group with hydraulic lift. Molding zone size 1000 x 400. |
| Vibropress STANDART 3.0 | 40 289 $ | Universal vibrating press of the III size group with a “color layer” module and a hydraulic lift. The size of the molding zone is 1000 x 400. |
| Name | Price | Description |
|---|---|---|
| Vibropress Professional 2.0+ | 120 650 $ | Universal vibropress V of the dimensional group, with the size of the molding zone 1200x800, the height of the product 40 ... 350, the vibro -shock type Vibroostol |
| Name | Price | Description |
|---|---|---|
| MAXIMAL Block Making Machine | 41 942 $ | Powerful vibropress for small concrete goods |
| Vibropress MAXIMAL 2.0 | 46 146 $ | Powerful vibropress melkochshtuchnyh for concrete products with the receiving roller conveyer hydraulic ram for collection of pallets with finished products. |
| Vibropress MAXIMAL 3.0 | 53 164 $ | Powerful vibropress melkochshtuchnyh for concrete products with the receiving roller conveyer hydraulic ram for collection of pallets with finished products and module "color layer" |
| Vibropress MAXIMAL 4.0 | 56 240 $ | Stacking of finished products on a Euro pallet eliminates the use of a forklift |
| Vibropress MAXIMAL PRO 2.0 | 53 226 $ | A vibro -stroke type Vibroostol for fine -storage concrete products with a foster roller gang of hydraulic lifts for collecting pallets with finished products. |
| Vibropress MAXIMAL PRO 3.0 | 68 327 $ | The vibration type of shock type of the tank module of the second layer. Forms at the same time 3 road borders according to GOST |
| Vibropress MAXIMAL PREMIUM 2.0 | 66 906 $ | A vibro -stroke type Vibroostol for fine -storage concrete products with a foster roller gang of hydraulic lifts for collecting pallets with finished products. Shock type vibrostol. Fast replacement system of press forms |
| Vibropress MAXIMAL PREMIUM 3.0 | 82 568 $ | The vibration type of shock type, the rolling module of the second layer. Fast replacement system of press form. Forms at the same time 3 road borders according to GOST |
|
Automatic line MAXIMAL on hydraulic lift |
110 796 $ | Maximum eliminates unnecessary manual operation and human factors in the production vibropressed products. |
|
Automatic line MAXIMAL with stackers |
122 865 $ | Maximum eliminates unnecessary manual operation and human factors in the production vibropressed products. |
|
Automatic line MAXIMAL PRO 2.0 with stackers |
149 917 $ | Maximum eliminates unnecessary manual operation and human factors in the production vibropressed products. |
|
Automatic line MAXIMAL PRO 2.0 with hydraulic lift |
137 894 $ | Maximum eliminates unnecessary manual operation and human factors in the production vibropressed products. |
|
Automatic line MAXIMAL with stackers and robot loader |
179 147 $ | Maximum eliminates unnecessary manual operation and human factors in the production vibropressed products. |
| Name | Price | Description |
|---|---|---|
|
Automatic supply line And packaging pallets |
21 739 $ | Automatic line of operation of the line. For packaging and preparing building materials, such as cinder blocks, paving slabs and other products. |
| Name | Price | Description |
|---|---|---|
| Vibropress OPTIMAL Mini with module | 20 207 $ | Universal vibrating press of the II size group with the size of the molding zone 800 x 400 |
| Vibropress OPTIMAL Mini with conveyor | 22 930 $ | Universal vibrating press of the II size group with the size of the molding zone 800 x 400 |
| Vibropress OPTIMAL | 27 154 $ | Universal vibrating press of the II size group with the size of the molding zone 800 x 400 |
| Vibropress OPTIMAL 2.0 | 29 213 $ | The universal vibroPress of the II of the size group with the size of the molding zone 800 x 400 with the receiving rolling of the hydraulic lift for the collection of trays with finished products. |
| Vibropress OPTIMAL 3.0 | 32 780 $ | Universal vibroPress II of the dimensional group with the size of a molding zone 800 x 400 with a receiving roll of hydraulic lift for the collection of trays with finished products and the “color layer” module |
| Vibropress OPTIMAL 4.0 | 31 253 $ | Universal vibroPress II of the size group with the size of the molding zone 800 x 400, stacking directly on Europalette |
| Vibropress OPTIMAL 5.0 | 34 461 $ | Universal vibropress II of the size group with the size of a molding zone 800 x 400 stacking directly on Europalette |
| Name | Price | Description |
|---|---|---|
| NESUSHKA movable Block Making Machine | 28 065 $ | Mobile vibropress |
| NESUSHKA Block Making Machine with Loader | 32 721 $ | Mobile vibropress with Loader |
| Name | Price | Description |
|---|---|---|
| Vibropress for PEGAS FBS blocks | 54 670 $ | For the production of CFC blocks with a hopper and a loading compartment |
| Vibropress PEGAS with bucket | 59 192 $ | For production of FBS blocks |
|
Vibropress PEGAS-2 for FBS blocks and truncated border |
57 939 $ | For the production of CFC blocks with a hopper and a loading compartment |
| Vibrocompressor PHOENIX PL for plates and blocks | 44 825 $ | For the production of PL slabs and blocks the hopper and the loading compartment |
| Name | Price | Description |
|---|---|---|
| Vibropress KS | 17 136 $ | For the production of all types of rings KS7, KS10, KS15, KS20 |
| Vibropress KS with concrete paver | 32 476 $ | For the production of all types of rings KS7, KS10, KS13, KS15 and KS20 with a concrete paver for uniform loading of the mold with the finished mixture |
| Vibropress KS 2.0 | 30 603 $ | For the production of all types of rings KS7, KS10, KS13, KS15 and KS20. Possibility to produce a support ring with a bottom (CODE) |
| Vibropress KS 2.0 with concrete paver | 54 126 $ | For the production of all types of rings KS7, KS10, KS13, KS15 and KS20 with a concrete paver for uniform loading of the mold with the finished mixture |
| Vibropress KS 2.0 for pit | 34 839 $ | For the production of all types of rings KS7, KS10, KS13, KS15 and KS20. Possibility to produce a support ring with a bottom (CODE) |
| Name | Price | Description |
|---|---|---|
| Vibroform of cover PP (N)7 | 191 $ | Vibroform for the manufacture of floors and bottoms of wells in accordance with the requirements of GOST 8020-2016. |
| PP (N) 10 ring floor/bottom slab panel vibroform | 277 $ | Vibroform for the manufacture of floors and bottoms of wells in accordance with the requirements of GOST 8020-2016. |
| PP (N) 15 ring floor/bottom slab panel vibroform | 351 $ | Vibroform for the manufacture of floors and bottoms of wells in accordance with the requirements of GOST 8020-2016. |
| PP (N) 20 ring floor/bottom slab panel vibroform | 426 $ | Vibroform for the manufacture of floors and bottoms of wells in accordance with the requirements of GOST 8020-2016. |
| Name | Price | Description |
|---|---|---|
| Stone splitting press 10 tons, 400 mm | 3 465 $ | For splitting stones (force 10 tons) |
| Stone splitting press 20 tons, 400 mm | 3 802 $ 4 550 $ | For splitting stones (20 tonnes of force) |
| Stone splitting press 60 tons, 800 mm | 8 340 $ | For splitting stones (60 tonnes of force) |
| Stone splitting press 80 tons, 800 mm | 7 514 $ 8 405 $ | For splitting stones (80 tonnes of force) |
| Stone splitting press 80 tons, 1200 mm | 8 518 $ 9 507 $ | For splitting stones (force of 80 tons, a knife) |
| Name | Price | Description |
|---|---|---|
| ULTRA line with BP-1G-300 + LK 5-05 | 20 273 $ | Pressing line based on vibropress Ultra and BP-1G-300 + LK 5-05 |
| ULTRA line with BP-2G-375S on the overpass | 29 520 $ | Pressing line based on the Ultra vibropress with BP-2G-375S on the overpass |
|
ULTRA line PD-2G-375C on base + LK 5-05 |
30 695 $ | Pressing line based on the Ultra vibropress with BP-2G-375S on a stand + LK 5-05 |
| ULTRA line with MOBIL-20 + LK 5-0.5 | 51 784 $ | Pressing line based on the Ultra vibropress with MOBIL-20 + LK 5-0.5 |
| ULTRA line with COMPACT-20 | 52 091 $ | Pressing line based on the Ultra vibropress with the COMPACT-20 concrete plant |
| Line OPTIMAL 2.0 with BP-1G-300 + LK 6-0.5 | 34 812 $ | Pressing line based on vibropress OPTIMALS with BP-1G-300 + LK 6-0.5 |
| OPTIMAL 2.0 line with Mini-RBU-10 | 43 602 $ | Pressing line based on the OPTIMAL vibropress with Mini-RBU-10 |
|
OPTIMAL 3.0 line with BP-1G-300, LK 6-0.5 and BP-1G-100, LK-5-0.5 |
43 569 $ | Pressing line based on the OPTIMAL 2.0 vibropress with BP-1G-300, LK 6-0.5 and BP-1G-100, LK-5-0.5 |
|
STANDARD line with BP-2G-375S on the overpass |
54 263 $ | Press line based on the STANDARD vibrating press with a live roll and with BP-2G-375S on a flyover |
|
STANDARD line with BP-2G-375S on a stand + LC 7-0.5 |
56 177 $ | Press line based on the STANDARD vibrating press with a roller table with BP-2G-375S on a stand + LK 7-0.5 |
|
STANDARD line with MOBIL-20 + LK 7-0.5 |
80 537 $ | Press line based on STANDART vibrating press with roller table with MOBIL-20 + LK 7-0.5 |
|
STANDARD line CD-20 |
80 340 $ | Press line based on the STANDART vibropress with a roller table with COMPACT-20 |
|
MAXIMUM 2.0 line with BP-2G-375S on the overpass |
68 853 $ | Pressing line based on the MAXIMAL vibropress with a hydraulic lift from BP-2G-375S |
|
MAXIMUM 2.0 line with BP-2G-375S on a stand + LC 7-0.5 |
70 770 $ | Press line based on the MAXIMAL vibrating press with a hydraulic lift with BP-2G-375S on a stand + LK 7-0.5 |
|
MAXIMUM 2.0 line with MOBIL-20 + LK 7-0.5 |
95 130 $ | Pressing line based on MAXIMAL vibropress with concrete plant MOBIL-20 + LK 7-0.5 |
|
MAXIMUM 2.0 line CD-20 |
94 930 $ | Press line based on the MAXIMAL vibrating press with a hydraulic lift with COMPACT-20 |
| Name | Price | Description |
|---|---|---|
| LK 3-0,5 Belt Conveyor | 2 244 $ | Length 3 m, width 0.5 m. Smooth tape |
| LK 5-0,5 Belt Conveyor | 2 892 $ | Length 5 m, width 0.5 m. Smooth tape |
| Belt conveyor LC 7-0.5 | 3 748 $ | Length 6 meters, width 0.5 m.Smooth tape |
| LK 8-0,5 Belt Conveyor | 4 118 $ | Length 8 m, width 0.5 m. Smooth tape |
| LK 10-0,5 Belt Conveyor | 5 031 $ | Length 10 m, width 0.5 m. Smooth tape |
| LK-16-0,6 Belt Conveyor | 7 681 $ | Length 16 m, width 0.6 m. Chevron tape |
| LK-18-0,8 Belt Сonveyor | 12 985 $ | Length 18 m, width 0.8 m. Chevron tape |
| Belt conveyor LK-21-1 | 17 934 $ | Length 21 m, width 1.0 m. Chevron belt |
| Conveyor cover 800 mm wide | 180 $ | To protect conveyor belts from adverse weather conditions and external factors |
| Conveyor cover 1000 mm wide | 231 $ | To protect conveyor belts from adverse weather conditions and external factors |
| Name | Price | Description |
|---|---|---|
| Compressor B5200B/200 CT4 | 1 618 $ | Receiver volume 200 l., pr-t 530 lmin |
| ABAC B 5900B/200 СТ 5,5 Compressor | 1 999 $ | Receiver volume 200 l, capacity 653 l/min |
| ABAC B 6000/270 CT 7,5 Compressor | 2 491 $ | Receiver volume 270 l, capacity 827 l/min |
| Name | Price | Description |
|---|---|---|
| Pump PSTC 40-125/15 | 330 $ | For water supply (1.5 kW, 27 cubic meters per hour) |
| Pump PSTC 50-125/30 | 485 $ | For water supply (3 kW, 48 cubic meters per hour) |
| Pump PSTC 65-125/75 | 667 $ | For water supply (7.5 kW, 72 cubic meters per hour) |
| Pump PSTC 80-125/75 | 667 $ | For water supply (7.5 kW, 90 cubic meters per hour) |
| Pumped Calpeda NM 40/12 F / A | 940 $ | For water supply (1.1 kW, 30 cu m per hour) |
| Pump Calpeda NM 65/12 C / B | 2 405 $ | For water supply (5.5 kW, 120 cu m per hour) |
| Pump Calpeda MXH 202E | 482 $ | For chemical additives supply (0.33 kW, 4.25 cu m per hour) |
| Name | Price | Description |
|---|---|---|
| Steamheler Tedar PG-500 on shoulder | 9 181 $ | steam up to +110 °C / 0.05 MPa / 500 kg/hour |
| TEPLO PG-500 steam generator in a block container | 13 726 $ | steam up to +110 °C / 0.05 MPa / 500 kg/hour |
| Steamheler Tedar PG-1000 on shoulder | 13 082 $ | steam up to +110 °C / 0.05 MPa / 1000 kg/hour |
| TEPLO PG-1000 steam generator in the block container | 19 755 $ | steam up to +110 °C / 0.05 MPa / 1000 kg/hour |
| Steamsheller Tedar PG-1500 on shoulder | 17 073 $ | steam up to +110 °C / 0.05 MPa / 1500 kg/hour |
| TEPLO PG-1500 steam generator in the block container | 25 018 $ | steam up to +110 °C / 0.05 MPa / 1500 kg/hour |
| Steamer Tedar PG-2000 on shoulder | 18 810 $ | steam up to +110 °C / 0.05 MPa / 2000 kg/hour |
|
TEPLO PG-2000 steam generator in a block container |
26 381 $ | steam up to +110 °C / 0.05 MPa / 2000 kg/hour |
| Name | Price | Description |
|---|---|---|
| TEPLO PGVM-150 steam generator | 19 386 $ | steam up to +180 °C / 0.9 MPa / 150 kg/hour |
| TEPLO PGVSh-150 steam generator | 24 674 $ | steam up to +180 °C / 0.9 MPa / 150 kg/hour |
| Steam generator TEPLO PGSD-500 (0.6 MPa) | 22 999 $ | steam up to +165 °C / 0.6 MPa / 500 kg/hour |
| Steam generator TEPLO PGSD-500 (0.6 MPa) in a block container | 35 108 $ | steam up to +165 °C / 0.6 MPa / 500 kg/hour |
| Steam generator TEPLO PGSD-500 (1.3 MPa) | 31 038 $ | steam up to +195 °C / 1.3 MPa / 500 kg/hour |
| Steam generator TEPLO PGSD-500 (1.3 MPa) in a block container | 45 767 $ | steam up to +195 °C / 1.3 MPa / 500 kg/hour |
| Steam generator TEPLO PGSD-1000 (0.6 MPa) | 25 704 $ | steam up to +165 °C / 0.6 MPa / 1000 kg/hour |
| Steam generator TEPLO PGSD-1000 (0.6 MPa) in a block container | 42 540 $ | steam up to +165 °C / 0.6 MPa / 1000 kg/hour |
| Steam generator TEPLO PGSD-1000 (1.3 MPa) | 37 251 $ | steam up to +195 °C / 1.3 MPa / 1000 kg/hour |
| Steam generator TEPLO PGSD-1000 (1.3 MPa) in a block container | 51 472 $ | steam up to +195 °C / 1.3 MPa / 1000 kg/hour |
| Steam generator TEPLO PGSD-1500 (0.6 MPa) | 35 414 $ | steam up to +165 °C / 0.6 MPa / 1500 kg/hour |
| Steam generator TEPLO PGSD-1500 (0.6 MPa) in a block container | 51 411 $ | steam up to +165 °C / 0.6 MPa / 1500 kg/hour |
| Steam generator TEPLO PGSD-1500 (1.3 MPa) | 42 895 $ | steam up to +195 °C / 1.3 MPa / 1500 kg/hour |
| Steam generator TEPLO PGSD-1500 (1.3 MPa) in a block container | 57 209 $ | steam up to +195 °C / 1.3 MPa / 1500 kg/hour |
| Steam generator TEPLO PGSD-2000 (0.6 MPa) | 39 173 $ | steam up to +165 °C / 0.6 MPa / 2000 kg/hour |
| Steam generator TEPLO PGSD-2000 (0.6 MPa) in a block container | 54 412 $ | steam up to +165 °C / 0.6 MPa / 2000 kg/hour |
| Steam generator TEPLO PGSD-2000 (1.3 MPa) | 45 026 $ | steam up to +195 °C / 1.3 MPa / 2000 kg/hour |
| Steam generator TEPLO PGSD-2000 (1.3 MPa) in a block container | 59 247 $ | steam up to +195 °C / 1.3 MPa / 2000 kg/hour |
| Name | Price | Description |
|---|---|---|
| TEPLO TGV-250 on Ramay | 20 718 $ | Air up to +170 °C / 11500 Pa / 250 kW |
| TEPLO TGV-250 in a block container | 25 696 $ | Air up to +170 °C / 11500 Pa / 250 kW |
| TEPLO TGV-450 TEPLO Generator on Ramay | 23 892 $ | Air up to +170 °C / 11500 Pa / 450 kW |
| TEPLO TGV-450 in a block container | 30 947 $ | Air up to +170 °C / 11500 Pa / 450 kW |
| TEPLO THV-600 TEPLO Generator | 30 297 $ | Air up to +170 °C / 11500 Pa / 600 kW |
| TEPLO TGV-600 heat generator in a block container | 38 548 $ | Air up to +170 °C / 11500 Pa / 600 kW |
| TEPLO TGV-800 TEPLO Generator | 38 126 $ | Air up to +170 °C / 11500 Pa / 800 kW |
| TEPLO TGV-1000 heat generator | 48 960 $ | Air up to +170 °C / 11500 Pa / 1000 kW |
| Name | Price | Description |
|---|---|---|
|
Water heating boiler TEPLO KVA-0.1 Gn/LV two-way |
2 050 $ | t up to 105 °C / Power 0.1 MW |
| Teplo KVA-0.25 GN/LV boiler boiler Teplo | 3 602 $ | t up to 105 °C / Power 0.25 MW |
|
Water heating boiler TEPLO KVA-0.5 Gn/LV two-way |
6 037 $ | t up to 105 °C / Power 0.5 MW |
|
Water heating boiler TEPLO KVA-0.7 Gn/LV two-way |
8 465 $ | t up to 105 °C / Power 0.7 MW |
|
Water heating boiler TEPLO KVA-1.0 Gn/LV two-way |
10 486 $ | t up to 105 °C / Power 1.0 MW |
|
Water heating boiler TEPLO KVA-1.5 Gn/LV two-way |
15 095 $ | t up to 105 °C / Power 1.5 MW |
|
Water heating boiler TEPLO KVA-2.0 Gn/LV two-way |
19 318 $ | t up to 105 °C / Power 2.0 MW |
|
Water heating boiler TEPLO KVA-3.0 Gn/LV three-way |
22 681 $ | t up to 105 °C / Power 3.0 MW |
| Name | Price | Description |
|---|---|---|
| VK-5 water boiler room | 15 781 $ | T to 95 ° C / 0.21 Gcal / Hour |
|
VK-5 water boiler room in a block container |
21 547 $ | T to 95 ° C / 0.21 Gcal / Hour |
| VK-7 water boiler room | 17 789 $ | T to 95 ° C / 0.42 Gcal / Hour |
|
VK-7 water boiler room in a block container |
24 857 $ | T to 95 ° C / 0.42 Gcal / Hour |
| VK-10 water boiler room | 20 793 $ | T to 95 ° C / 0.6 Gcal / Hour |
|
VK-10 water boiler room in a block container |
27 459 $ | T to 95 ° C / 0.6 Gcal / Hour |
| VK-15 water boiler room | 29 070 $ | T to 95 ° C / 0.86 Gcal / Hour |
|
VK-15 water boiler room in a block container |
39 780 $ | T to 95 ° C / 0.86 Gcal / Hour |
| Name | Price | Description |
|---|---|---|
|
Teplo KTM-0.15 heat-oil boiler Pump High Temp |
16 061 $ | t up to 300 °С / 0.15 Gcal/h |
|
Teplo KTM-0.3 heat-oil boiler Pump High Temp |
18 504 $ | t up to 300 °C / 0.3 Gcal/h |
|
Teplo CTM-0.5 boiler Pump High Temp |
22 251 $ | t up to 300 °С / 0.5 Gcal/h |
|
Teplo CTM-0.65 Pump High Temp |
24 475 $ | t up to 300 °С / 0.65 Gcal/h |
|
Teplo KTM-1,0 heat-oil boiler Pump Base |
34 490 $ | t to 250 ° C / 1.0 gpal / h |
|
Teplo CTM-1.5 boiler Pump High Temp |
48 870 $ | t up to 300 °C / 1.5 Gcal/h |
|
Teplo CTM-2,0 heat-oil boiler Pump High Temp |
68 703 $ | t up to 300 °C / 2.0 Gcal/h |
|
The boiler is thermish electric TEPLO KTM-0.03E |
7 707 $ | t up to 300 °C / 0.03 Gcal/h |
|
The boiler is thermish electric TEPLO KTM-0.1E |
16 537 $ | t up to 300 °C / 0.1 Gcal/h |
| Name | Price | Description |
|---|---|---|
| Teplo BP-2 bitumen | 11 655 $ | 2 tons/hour |
|
Bitumen melting electric TEPLO BP-1E |
15 146 $ | 1 ton/hour / 0.1 Gcal/hour |
|
Autonomous bitumen storage Teplo BHA-30 |
42 841 $ | Volume 30 m3 / 0.3 Gcal/h |
| Teplo BX-30 bitumen | 14 307 $ | Volume 30 m3 |
| Teplo BX-45 bitumen | 24 439 $ | Volume 45 m3 |
| Name | Price | Description |
|---|---|---|
| Horizontal water tank BVG-4 | 3 029 $ | Volume 4 m3 |
| Teplo BV-7 water heating tank | 4 897 $ | Volume 7 m3 |
| Horizontal water tank BVG-15 | 9 192 $ | Volume 15 m3 |
| Horizontal water tank BVG-25 | 10 884 $ | Volume 25 m3 |
| Name | Price | Description |
|---|---|---|
| Tank for diesel fuel Teplo BD-0.6 | 499 $ | Volume 0.6 m3 |
| Tank for diesel fuel Teplo BDT-1 | 700 $ | Volume 1.0 m3 |
| Tank for diesel fuel Teplo BD-5 | 2 849 $ | Volume 5 m3 |
| Tank for diesel fuel Teplo BD-7 | 3 927 $ | Volume 7 m3 |
| Tank for diesel fuel Teplo BDT-10 | 5 846 $ | Volume 10 m3 |
| Tank for diesel fuel Teplo BD-25 | 7 755 $ | Volume 25 m3 |
| Name | Price | Description |
|---|---|---|
| Operator's cab | 2 100 $ | Basic operator cabin |
| Enlarged Operator Cab (luxury version) | 4 621 $ | Enlarged size of operator's cab, increased view ability, air conditioning, heating, furniture (new) |
|
Hopper cover kit with automatic drive DK-24 |
4 241 $ | On a bunker with 2 sections. Applicable only for FLAGMAN factories |
| Modular sandwich cladding MSO-30 | 31 677 $ | For bins with 2 sections. Applicable only for FLAGMAN factories |
| Modular sandwich cladding MSO-60 | 44 548 $ | For bins with 3 sections. Applicable only for FLAGMAN factories |
| Bunker heating registers Rob steam for DK-24 | 1 044 $ | For bins with 2 sections Applicable only for FLAGMAN plants |
| Bunker heating registers Rob steam for DK-36/ DK-54 | 1 564 $ | For bins with 3 sections. Applicable only for FLAGMAN factories |
|
Grate for a 100x100 bunker section for dk To the Flagship-30 plant with Rob |
1 425 $ | For screening the coarse fraction |
|
Grate for a 100x100 bunker section for dk To the Flagship -45, -60, -90 with robe |
1 767 $ | For screening the coarse fraction |
|
Lattice for bunker section 70x70 for DK-24 to the Flagship-30 plant with Rob |
1 834 $ | For screening the coarse fraction |
| Name | Price | Description |
|---|---|---|
| Supported bucket | 646 $ | Bucket on a support (1 cubic meter). Delivery with tray is possible |
| Hopper unloader | 8 395 $ | Device for unloading hopper cars |
| Tangential sand trap | 6 169 $ | For the treatment of industrial and domestic wastewater by retaining and removing small particles of heavy minerals (sand) with an efficiency of about 90-98%. |
| Name | Price | Description |
|---|---|---|
| Addressable mixture dispenser - ART-1500 | 52 153 $ | Concrete bucket is designed for targeted distribution of rigid and mobile concrete mixes in production areas |
| Name | Price | Description |
|---|---|---|
| commissioning of equipment | 5 202 $ | It includes the cost of travel, accommodation and subsistence expenses |
| Installation supervision | 2 601 $ | It can only be ordered in conjunction with the commissioning |
| Installation supervision of the plant with insulation | 5 202 $ | It includes travel, accommodation and travel expenses commissioning engineer. |
Our relationship with our customers more than just "Purchase - Sale"
Желающие купить рбу с достаточной степенью предвзятости изучают предложения многочисленных продавцов – посредников, желая увидеть вожделенные расценки, ниже которых продается только металлолом. В результате неопытные предприниматели попадаются на удочку недобросовестных продавцов, не получив ни гарантийных обязательств, ни обещанных пусконаладочных работ. Да и сам продаваемый завод был им показан лишь на фальсифицированных фотографиях известных брендов. Поговорка «Скупой платит дважды!» вспоминается ими уже на первом месяце активной эксплуатации приобретенного контрафакта. ЗЗБО строит стратегию своих отношений с заказчиками, предполагая долговременное сотрудничество. Оно заключается в неукоснительном выполнении двухлетних гарантийных обязательств и техническом патронаже своей продукции по истечении этих сроков. В случае непредвиденных выходов из строя оборудования бетонных заводов, купленных в Златоусте, у заказчиков нет сомнений, к кому обратиться за помощью. ЗЗБО оперативно пришлет специалистов и в считанные дни предоставит со СВОИХ складов (!) необходимые узлы и детали, включая импортные комплектующие.Our pricing policy
Вопросы изготовления собственной продукции, то есть бетоносмесительного оборудования, и ее реализации для завода ЗЗБО выходят за рамки классической формулы коммерческого успеха: «Купил подешевле, продал подороже», хотя, естественно, наше производство рентабельно. Просто торгашеское желание «урвать подешевле» заменено элементарными оптовыми закупками своего уральского металла по оптовым ценам, которые, например, туркам, немцам и итальянцам даже не снились. В свою очередь, импортные комплектующие приобретаются ЗЗБО у производителей в рамках прямых договоров поставок и предоставления ЗЗБО представительского статуса для этих брендов. Не нужно забывать, что идеальный вариант получения прибыли для машиностроительного предприятия – это не перепродажа металла или оборудования с торговыми «накрутками», а реализация своей работы, которая заключается в изготовлении качественного сертифицированного металлоизделия и последующего оплачиваемого заказчиком технического обслуживания. Мало кто из продавцов бетонных заводов включает в свои услуги шеф-монтажные и пуско- наладочные работы, потому что их просто некому выполнять.What can we buy?
We can buy everything you need for concrete manufacture complete technological cycle:- Concrete plants in complete set;
- Completing machines and mechanisms for RBU price is listed on the page;
- Installation, commissioning, maintenance and repair;
- Spare parts and mechanisms, including foreign production;
- Technical documentation on the concrete plant and its component units;
- Technical documentation for the preparation of the territory for placing concrete plant (foundation plan, the plan of electric, water, etc.);
- Complete documentation and equipment to ensure year-round operation of the concrete plant;
- Business plans for cost-effective use of our equipment.

